UpdatedTariff updated for June 2026
Rates now reflect the latest BERC government tariff, effective from the June 2026 billing cycle.
Electricity Tariff Rates (High Tension (HT) - 33kV)
View detailed tariff rates for different voltage levels approved by BERC.
Which rate applies to you?Tap your situation to jump to the right category.
High Tension (HT) - 33kV
Rates applicable for consumers connected at HT level.
HT-1: General Purpose
General usage at 33kV
HT-2: Commercial & Office
Commercial usage at 33kV
HT-3: Industry
Large scale industrial at 33kV
HT-4: Construction
Construction power at 33kV
| Category | Rate / Calculation | Demand |
|---|---|---|
HT-1: General Purpose HT-1General usage at 33kV | Peak৳15.67 Off-Peak৳11.28 | ৳90/kVA |
HT-2: Commercial & Office HT-2Commercial usage at 33kV | Peak৳17.05 Off-Peak৳12.28 | ৳90/kVA |
HT-3: Industry HT-3Large scale industrial at 33kV | Peak৳15.93 Off-Peak৳11.47 | ৳90/kVA |
HT-4: Construction HT-4Construction power at 33kV | Peak৳19.95 Off-Peak৳14.36 | ৳90/kVA |
Important Notes:
- Off-Peak Hours: Generally 11:00 PM to 5:00 PM next day (For LT-D3 and MT-7: 11:00 PM to 5:00 AM and 9:00 AM to 5:00 PM)
- Super Off-Peak: 5:00 AM to 9:00 AM (Only for LT-D3 and MT-7)
- Peak Hours: Generally 5:00 PM to 11:00 PM
- VAT: Applicable as per government rates
- One-time Payment Rebate: 5% discount applicable for all customer categories
- Pre-paid Meter Rebate: 0.5% rebate on net bill (excluding VAT)
Use these rates
Tariff rates are most useful when you put them to work. The links below open tools and guides that use these exact figures.
Bill calculator
Enter your units and get a slab-by-slab breakdown at the current BERC tariff.
TOU tariff explained
Industrial and large commercial consumers in Bangladesh can opt into TOU rates. We explain when it actually pays off — and when it doesn't.
Change your load
Adding a big appliance, or using less than before? Here's how to change your sanctioned load, and what it does to your demand charge and security deposit.
New connection cost
Pick your category, phase and sanctioned load to get an itemised estimate of what a new connection costs upfront — deposit, application fee and meter charge — plus the recurring meter rent.